With the roof nearly complete, work continues to escalate on the interior items. The framing is complete, the
HVAC units have been installed, the duct work is underway, the Electrician is currently pulling wires for lights and outlets and some insulation has been installed. The exterior of the building is being prepared for the stucco while the site concrete is almost finished.