Tuesday, March 31, 2009

Exterior Finishes





Posted by Picasa

Site Work

Concrete flatwork and landscaping.



Posted by Picasa

Tuesday, March 24, 2009

Carpet

The first sections of carpet were installed yesterday, bringing a finished look and unmistakable smell!




Posted by Picasa

Exterior Finishes

Tile work and Accent paint features around the exterior of the building are nearly finished.

Posted by Picasa

Storage

Installation of cabinets and shelving is nearly finished. The brown cabinets will be for technical reference data while the shelving will be mostly for office supplies.


Posted by Picasa

Conference Room


The engineered wood floor has been installed in the main conference room.
Posted by Picasa

Metal Roof

The curved back patio roof is nearing completion with the standing seam metal roof. The front roof element has the gutter installed and is ready for the same treatment.


Posted by Picasa

Concrete



The first on-site concrete sidewalks were poured along the South edge of the building.

Tuesday, March 3, 2009

Tilework


Mens restroom.


Womens restroom.
Posted by Picasa

Vents

As a feature of the ceiling we choose, the AC vents will look much different than most offices. Both the returns and the diffusers are six inches wide and four to five feet long.
Posted by Picasa

Patio



The back patio cover has been erected. Forget colors and lights and windows, welded steel is what we get excited about! Thanks to Wilson Hanna for the Structural Engineering.
Posted by Picasa